Rollover images to enlarge.

Shoring Systems

Denver Art Museum, overall sequence plan

Through interaction with BIM Modeling and by using creative design methods, detailed shoring procedures are developed with 3D CAD modeling and written plans.  Shoring removal parameters and techniques are also put into place to maintain proper erection tolerances and alignment of the structure.  L.P.R. in-house engineered shoring towers, which have been used on multiple projects, are setup and utilized for the most complex structural framing imaginable.

 

 

 

L.P.R. Construction Co. | 1171 Des Moines Avenue | Loveland, Colorado 80537
Business 800.577.1844 | Metro 303.665.7501 | Fax 970.663.2073

Denver Art Museum Shores

LPR Shores CAD

Memphis Arena Shores

Denver Art Museum Shores (Credit Fred J. Fuhrmeister-Time Frame Photography)

LPR Shores CAD

Denver Art Museum Shores

Denver Art Museum Shores

LPR Shores CAD Drawing

Denver Art Museum Shores

Ameristar Shores