Rollover images to enlarge below. |
Broomfield Event Center
Location: Broomfield, CO
General Contractor: Saunders Construction, Inc.
Fabricator: Prospect Steel Company
Tons: 1500 tons
Area: 175,000 sf
Description
The new home for the Rocky Mountain Rage CHL and the Colorado
14er’s NBA D-League teams is a 6,000 seat arena which will house not
only hockey and basketball, but concerts and 25 other special events. The
incredibly short schedule drove the construction team to quickly work through
design and fabrication so L.P.R. could work long days erecting 1500 tons of
structural steel under 65,000sf of metal deck.
2 months after breaking ground, L.P.R. started erecting steel and less than
4 months later, L.P.R. topped out the structure. The 8 – 192’
trusses which span the arena floor had to be assembled on the ground prior
to erecting. The remaining steel was infill between the trusses and framing
to house the suites and club seating.